top of page

Nucleus Network Laboratory + Consult Expansion
QIMR Herston

PROJECT SUMMARY:

We worked with Nucleus Network to reconfigure some of their redundant space into a new laboratory and ancillary support rooms; create additional offices for the Doctors; increase their consultation capacity by creating an additional six consult rooms, and upgrade their reception area.

Works were completed in a live environment, and in stages that ensured the flow of patients and staff operations continued, uninterrupted.

PROJECT DETAILS:

Timeline: 11weeks (2 stages)
Project GFA: 500m2​
Location: QIMR Berghofer Research Institute, Herston

PROJECT FEATURES:

  • Design and Construct

  • Laboratory, including chemical resistant joinery and safety shower

  • Nurse Call

  • AS3003 Body Protection in clinical areas

  • Synchronized master clock system

Nucleus Network Laboratory + Consult Expansion
QIMR Herston
bottom of page